Job Shop Scheduling
Choose machine orders for a job-shop instance to minimize makespan.
Job Shop Scheduling
Choose machine orders for a job-shop instance to minimize makespan.
Solution Interface
Submit a zip_project solution. The run command is executed once per case, reads the case from standard input, and writes the answer to standard output. The trusted separated evaluator runs the migrated Frontier-CS Testlib checker against the submitted output and the case's evaluator-only answer or scoring metadata.
Scoring
The leaderboard score is the average checker ratio scaled to 0..100 across official cases. Invalid outputs receive zero for the affected case. The public validation case is intentionally tiny and deterministic; official scoring uses the source-derived Frontier-CS cases packaged as private benchmark data.
Original Statement
Title: Job Shop Scheduling (JSPLIB-style) — Open Optimization Track
Overview
You are given a classic Job Shop Scheduling Problem (JSSP). There are J jobs and M machines. Each job must be processed exactly once on each machine, in a job-specific order (its route). Processing is non-preemptive. A machine can process at most one operation at a time. The goal is to minimize the makespan: the completion time of the last operation among all jobs.
This problem is NP-hard. We therefore use an open scoring scheme that rewards better (lower) makespans. See Scoring below.
Terminology
• Operation: A single (job, machine) processing step with a fixed processing time.
• Route of a job j: A sequence of M distinct machines (0..M-1) listing the order in which job j must visit them.
• Precedence (job chain): If the k-th operation of job j precedes its (k+1)-th, the latter cannot start before the former finishes.
• Resource constraint (machine): Operations assigned to the same machine cannot overlap in time.
• Makespan (C_max): The maximum completion time over all operations in the schedule.
Input Format
The input is plain text with 0-based indices.
Line 1: J M • J (integer): number of jobs (J ≥ 1) • M (integer): number of machines (M ≥ 1)
Lines 2..(J+1): one line per job j in order j = 0..J-1. Each line contains 2*M integers representing the route and processing times for job j:
m_0 p_0 m_1 p_1 ... m_{M-1} p_{M-1}
where:
• m_k ∈ {0,1,...,M-1} is the machine index of the k-th operation of job j.
• p_k is a positive integer (processing time of that operation).
• Each machine index must appear exactly once in a job’s line (every job uses every machine exactly once).
• The order of the pairs on the line determines the job’s precedence constraints.
Output Format
You must output exactly M lines.
Line m (for m = 0..M-1) must contain J distinct integers: a permutation of {0,1,...,J-1}.
This permutation specifies the order in which machine m processes the J jobs (from first to last).
Important:
• You do not print start or finish times.
• Your permutations must mention each job exactly once on every machine. Otherwise, the checker will reject the output.
• The judge constructs the earliest-feasible schedule implied by your machine orders and the job precedence constraints
(equivalently: the longest-path length in the disjunctive graph with your chosen orientations on machine arcs).
Validity Rules
Your output is rejected if any of the following occurs:
• A machine line does not contain a permutation of {0..J-1} (duplicate/missing job index; out-of-range index).
• The machine orders together with the job precedence constraints induce a cycle in the disjunctive graph
(i.e., there exists no feasible schedule consistent with your machine orders).
Scoring (Lower is Better)
Let P be the makespan computed from your output for a test case. The answer file for each test contains two integers: (B, T). For this problem, T is fixed to 0 (a trivial lower bound), and B > 0 is the makespan of a simple feasible baseline schedule (a naïve dispatch heuristic). The checker applies the general formula:
If B ≤ T: score = 1.0 if P ≤ T else 0.0 Else: score = clamp( (B - P) / (B - T), 0, 1 )
With T = 0 and B > 0, this simplifies to:
score = clamp( 1 - P / B, 0, 1 )
Your final problem score is the average of your per-test scores. The checker prints partial credit messages containing the substring “Ratio: <value>” as required by the judge.
Constraints
The official test set is deliberately challenging:
• Sizes range up to ~ (J, M) ≈ (50, 25) (total operations up to ~1,250).
• Processing times are positive integers and may range broadly (including very large values).
• Route structures include random, nearly-flow, block-flow, and strong bottlenecks (one or two machines dominating).
Tips
Feasible and competitive schedules often come from combinations of:
• Priority rules (SPT/LPT/weighted), bottleneck-aware dispatching.
• Local improvement via adjacent swaps per machine.
• Metaheuristics (tabu search, simulated annealing, iterated local search).
• Shifting bottleneck heuristics or relax-and-fix styles.
Example (Illustrative Only; Not in the Tests)
Input: 3 2 0 3 1 4 1 2 0 5 0 4 1 1
Valid Output (two lines; each line is a permutation of {0,1,2}): 2 0 1 1 2 0
This tells the judge to process jobs on machine 0 in order [2,0,1] and on machine 1 in order [1,2,0]. The judge then computes the earliest-feasible schedule and its makespan.